Players travelling to Hastings via London should be aware that there will be significant engineering works taking place between 23rd December and 1st January. Charing Cross, Waterloo East, London Bridge and Cannon Street stations will be closed. Amended timetables will be in operation from London Victoria, Blackfriars and St.Pancras (via Ashford)
For further information go to – www.thameslinkprogramme.co.uk/2017 and tfl.gov.uk/christmas-travel